Tensioning our mizzen shrouds
So far today we have tensioned 6 of the 8 mizzen shrouds.

All of them tensioned to at least 1,300kg and leaving them at over 1,000 for at least 15 minutes
So far today we have tensioned 6 of the 8 mizzen shrouds.
All of them tensioned to at least 1,300kg and leaving them at over 1,000 for at least 15 minutes
After Jane did all the splicing for the main mast rigging we had to stretch everything
Today (Monday) was a beautiful day. We managed: * To get the week's washing done * Hopefully fix the leak from the chainplate loop above Jane's side of the bed * Do some solar panel wiring and drill 4 more holes in the deck for solar wires * Do some
Working on Solar, Anglesey Coastal walks and battery panics
Working on Solar, Anglesey Coastal walks and battery panics