New Video: Getting the Mizzen Mast UP!!!!

This is a huge milestone for us. We have done huge amounts of work on the mizzen so it's great to finally have the mast in place.

The list of work includes:

  • Huge amount of strengthening below deck to support the mast
  • Fully clean and refit the mast base onto a strengthened deck
  • Remove some corroded fittings from the mast.
  • Remove, clean and service the mast head including all the sheaves, new topping life attachment and block
  • Remove, clean and refit the mast foot
  • Paint the mast, spreaders and boom (2 coats epoxy primer, 2 coats undercoat, 3 coats top coat)
  • Remove the spreaders., adapt for dyneema shrouds, paint and refit
  • Fit AIS antenna to the top of the mast
  • Fit WiFi boost antenna halfway up the mast
  • Fit pipe inside the mast for the wires
  • Make and fit 6 Acetyl tangs
  • Make, stretch and fit 8 dyneema shrouds
  • Massive new backing plates fitted for the chainplates
  • Make, stretch and fit 8 dyneema chainplates
  • Splice and fit 8 dyneema lashings (between the shouds and the chainplates)
  • Put the mast back up