Galley progress

We have made lots of good progress on the galley this weekend.

First Jane has painted the insulated hull plus the bulkhead. B&Q kitchen and bathroom paint (Whistler for the main areas and Monaco for the highlights).

Painted just before taking the tape off.

We then dry fitted the sink worktop. As we did so we redesigned it. Now that we are fitting a gimbled box for the hob and combination oven the corner is less accessible and not needed for the oven.

So we have shortened the worktop and used the extra for a shelf level with the bottom of the sink. This area will become a big cupboard including the otherwise dead space outboard of the sinks.

I've got the aft side of the space for the gimballed cooker fitted and the fiddle for the worktop (extends down to hide the sinks).

A floor and one shelf to fit under the sinks. We can't build the cupboard until we have fitted the insulation and that is waiting for the stanchion bases for the port gate.