
Dyneema rigging
Back at stretching dyneema rigging
Jane has finished the first 8 chainplate loops in 12mm dyneema for the main mast (we don't need one for the forestay and the inner forestay will be different). Plus she has finished 3.5 of the 4 lower shrouds (also 12mm dyneema). So we are back to