Plans
Preparing our Mizzen Mast for Dyneema rigging
Today it was time to start getting the mizzen mast prepared for the Dyneema Rigging. FR4 Tangs Jane got busy on carving the FR4 mast tangs. We need 8 (2 forestays, 2 cap shrouds, 2 lower shrouds, 2 running backstays). This was working with the basic "triangles" I